Applied Digital · Alexandria, Rapides Parish County, Louisiana
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Cleco. Regulated MISO utility serving the full campus load; Applied Digital reimburses all infrastructure and generation costs with assurances against cost-shifting to other customers, under Louisiana PSC oversight
Applied Digital (self-build). Greenfield build: two 150 MW buildings with closed-loop liquid cooling on a 672-acre parish allocation; site work began January 2026 reported
Not disclosed. Tenant hardware not announced; purpose-built for AI training and inference workloads inferred
Applied Digital. Builds, owns and operates the campus under the long-term hyperscaler lease (AI Factory model)
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.