Beale Infrastructure · De Soto, Johnson County, Kansas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Evergy. Serving utility (SPP); executed large-load electric service agreement Feb 2026, one of four Evergy ESAs totaling about 1.9 GW steady-state peak; service under the Kansas LLPS tariff (75 MW+ loads, 12-year minimum term) reported
Beale Infrastructure. Greenfield developer on about 285 acres at Flint Commerce Center (former Sunflower Army Ammunition Plant, adjacent to the Panasonic EV battery plant); grading underway, groundbreaking May 2026; closed-loop air cooling
Not disclosed. Tenant hardware not announced inferred
Not disclosed. Tenant identity and operating stack confidential until groundbreaking inferred
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Kansas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →