Center Registry · Virginia

Gainesville Crossing

Corscale Data Centers · Gainesville, Prince William County, Virginia

Verified by Center RegistryChecked against 5 sources, including primary filings and releases
Open on the map →
326 MW
Critical IT planned
144 MW
Energized today
2023-08
First power
PJM
Grid region · location approximate
In brief

What makes it notable.

  1. A dedicated on-site 135 kV Dominion substation with roughly 306 MW of capability was delivered in late 2022, and 144 MW of critical IT has been operating since August 2023.
  2. Planned critical capacity is 326 MW. Building 3 is under construction and buildings 4 and 5 are not yet scheduled.
  3. HITT Contracting built the greenfield campus to a Corgan design with N+1 air-cooled chillers, liquid-cooled options and a target PUE of 1.25.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Dominion Energy
Site and build
HITT Contracting, Corgan
Compute
Not disclosed
Cloud operator
Not disclosed
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2023-08First power
  2. Nov 2026Today
  3. not disclosedFull buildoutbuilding 3 in construction; buildings 4-5 unscheduled
The detail

Each party's role.

Power

Dominion Energy. Utility; dedicated on-site 135 kV substation with roughly 306 MW capability, delivered late 2022 reported

Site and build

HITT Contracting. General contractor (greenfield build) reported

Site and build

Corgan. Architect; air-cooled chillers N+1 with liquid-cooled options, target PUE 1.25 reported

Compute

Not disclosed. Tenant-controlled inferred

Cloud operator

Not disclosed. Tenant-controlled inferred

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Virginia?

Looking for GPU colocation or a campus in Virginia? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →