Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
AEP Texas (American Electric Power). 1,000 MW interconnection agreement; roughly 500 MW serves phase 1, the remainder under development for phase 2
Jacobs. EPCM lead (role expanded mid-2026) for the ~521-acre campus
Vertiv. Critical power and cooling infrastructure
NVIDIA. DSX reference architecture for gigawatt-scale AI infrastructure; both 352 MW phases are designed to it (the phase 1 data hall redesign enabled 57% more IT capacity within the same land and utility footprint)
Not disclosed. Tenant-controlled inferred