Nscale · Point Pleasant, Mason County, West Virginia
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Caterpillar. G3500-series natural gas generator sets for the first 2 GW (targeted online H1 2028); the phase-1 permit filing specifies 864 engines at 2.5 MW plus 120 auxiliary engines (2.16 GW)
Marcellus gas supply. Fuel via multiple pipelines including the 30-mile intrastate Prosperity Line; the nation's first state-certified AI microgrid (WV HB 2014), off-grid with a future grid tie-in option reported
Fidelis New Energy. Originated and developed the Monarch site and microgrid since 2021 with co-founder 8090 Industries; team folded into Nscale Energy & Power. Phase 1: three H-shaped buildings, four power nodes each, on up to 2,250 acres
NVIDIA. Vera Rubin NVL72 systems built to the NVIDIA DSX AI factory reference design
Nscale. Vertically integrated AI cloud operator, energy to compute
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.