IREN · Sweetwater, Nolan County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
ERCOT. Direct 1.4 GW substation, energized May 2026; the 2 GW Sweetwater Hub has conditional inclusion in ERCOT's Batch Zero process as base load (Nov 2026)
IREN. In-house air + direct-to-chip liquid cooling
NVIDIA. DSX architecture, HGX B300 liquid-cooled GPUs
IREN. In-house vertically integrated AI Cloud platform
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →