Fluidstack · New Lebanon, Sullivan County, Indiana
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Hoosier Energy + WIN Energy REMC. Generation and transmission cooperative plus local distribution cooperative under a multi-party power service agreement (MISO); dedicated on-site substation funded within the notes reported
Not disclosed. Greenfield build on 140 acres; GC and cooling design not publicly named; park infrastructure construction began April 2026 inferred
Google TPUs. Reported: the $35B financing leases Google TPUs to Anthropic across the five sites, with a Broadcom residual-value guarantee on the senior tranche reported
Fluidstack. AI cloud platform; operates the leased capacity
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Indiana? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →