Riot Platforms · Rockdale, Milam County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
ERCOT / Oncor. 700 MW approved via the Sandow Switch (former Alcoa site); Oncor delivers
Rockdale PPA (Whinstone US). 345 MW fixed-price PPA in three blocks (through 2027-2030)
Riot Platforms (in-house). Retrofit of existing Building G for high-density critical IT, delivered in phases (5 MW Jan 2026, remainder targeted May 2026); in-house data center team, Riot Engineering supplies power-distribution equipment
AMD (anchor tenant). AMD anchor lease; own accelerators (likely Instinct) inferred
AMD. Tenant operates its own compute workloads; Riot provides facility operations under the lease reported
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.