SB Energy · Burlington, Milam County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
SB Energy. Provides the powered infrastructure in ERCOT: high-voltage interconnection in phases (1-A 200 MW at 34.5 kV Aug 2026, 1-B 230 MW at 345 kV Dec 2026, 1-C 230 MW Feb 2027, 1-D switchover Mar 2027, ~660 MW initial) plus co-located generation under on-site power supply agreements; SB Energy has said it will fund and build new generation and storage for the campus to protect Texas ratepayers
SB Energy (owner-builder). Greenfield build via Milam County Data Center LLC on a 595-acre campus; phase 1 start filed 2025-10, topped out Mar 2026; design by Corgan
Undisclosed. No compute vendor named; the OpenAI first-party design announcements do not disclose suppliers inferred
OpenAI. Runs its own workloads under its first-party facility design; SB Energy operates the physical plant inferred