Scale Datacenters · Oklahoma City, Oklahoma County, Oklahoma
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Scale Datacenters. Triple redundant power retained from the 2013 Chesapeake corporate build; Level 3+ facility, tornado and seismically shielded; operator states the 10 MW load is served behind the meter on the former campus (council testimony) reported
OG&E territory (SPP). Host utility territory; no utility interconnection story is publicly confirmed reported
Scale Datacenters. Retrofit of an 82,000 sq ft corporate data center (built ~2013 for Chesapeake Energy, previously listed at 2.9 MW IT) to a 10 MW AI facility; closed-loop direct-to-chip liquid cooling; renewable matching claimed
Cerebras CS-3. 300+ wafer-scale CS-3 systems (WSE-3: 4 trillion transistors, 900,000 AI cores each), 44+ exaflops aggregate
Cerebras Inference Cloud. Dedicated inference serving (Llama, GPT-OSS, Qwen, DeepSeek) at 2,000 to 3,000 tokens per second
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Oklahoma? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.