VoltaGrid. Behind-the-meter on-site natural gas microgrid (INNIO Jenbacher engines) per press reporting citing project documents; the Vantage-VoltaGrid partnership covers 1 GW+ portfolio-wide. ERCOT is the region, the primary supply plan is off-grid reported
Kiewit. General contractor: 10 buildings, 3.7M sq ft on 1,200 acres; groundbreaking Dec 2025; closed-loop chiller design for 250kW+ racks with minimal water use reported
Not disclosed. No compute fleet announced for this campus inferred
Not disclosed. Operating stack not announced; Oracle-led under the Stargate model inferred