260 MW
Critical IT planned
260 MW
Energized today
2026
First power
ERCOT
Grid region · location approximate
In brief

What makes it notable.

  1. A conversion of a partly built 2021 bitcoin mining campus to liquid-cooled HPC, designed, built and operated in-house, on about 78.85 acres of city land that Core Scientific leases from the City of Denton.
  2. Power runs through Denton Municipal Electric by the Jim Christal substation, with an expanded city agreement giving access to about 394 MW. The existing 297 MW is conditionally approved by ERCOT as Base Load.
  3. The 260 MW of critical IT was substantially complete and billing by November 2026, after summer weather pushed energization into 2026.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
ERCOT, Denton Municipal Electric (DME), City of Denton
Site and build
Core Scientific
Compute
NVIDIA
Cloud operator
CoreWeave
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Nov 2026Today
  2. 2026First powersubstantially complete; ~260 MW billing as of 2026-11-05
  3. 2027Full buildout
The detail

Each party's role.

Power

ERCOT. Grid operator and balancing authority for Texas. The existing 297 MW is conditionally approved as Base Load, Pathway (a) (energized before 2022-03-25) and is outside Batch Zero; the additional 74 MW is already in ERCOT's 2025 Regional Transmission Plan cases

Power

Denton Municipal Electric (DME). Municipal utility (an ERCOT member); the campus sits by the DME Jim Christal substation, with an expanded city agreement providing access to ~394 MW

Power

City of Denton. Leases ~78.85 acres of city land near the Denton Energy Center to Core Scientific, which funds the electrical interconnection

Site and build

Core Scientific. Converting the ex-Bitcoin-mining campus (partially built 2021) to liquid-cooled high-density HPC; in-house design, build and operations. Cooling vendor undisclosed

Compute

NVIDIA. GPU supplier via CoreWeave; the specific model is not disclosed for Denton (GB200/GB300 class inferred from timing)

Cloud operator

CoreWeave. AI cloud platform / orchestration running on the hosted GPUs

Related sites

Nearby in the buildout.

All AI data centers in Texas →

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Texas?

Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →