Core Scientific · Pecos, Reeves County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Texas-New Mexico Power (TNMP). T&D utility for the campus: 300 MW of gross utility capacity energized, with an incremental ~300 MW confirmed with the utility but allocation timing undetermined
ERCOT. Independent system operator; TNMP's T&D activities are solely within ERCOT, covering far-west Texas between Midland and El Paso. The existing 300 MW is conditionally approved in Batch Zero as Base Load, Pathway (b); a further 300 MW is conditionally approved as Studied Load. Collateral posted; the final allocation and load ramp await the end of Batch Zero
Core Scientific (in-house development). Self-performs siting, design and development, converting a 300 MW bitcoin mining campus into AI data halls; first hall footings set and precast walls arriving as of 2026-04-27. No third-party general contractor is named for the AI build.
AMD Instinct GPUs / EPYC CPUs. Silicon named at partnership level; no filing assigns specific hardware to Pecos inferred
AMD ROCm. Software stack named alongside Instinct and EPYC in the deployment collaboration; not site-specific inferred
Core Scientific. Operates and maintains the campus
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.